Busroot Docs
  • Intro
    • Authentication
  • Integration
    • Device/DAU Management
    • Hardware
      • Arduino Opta
        • Configuration
      • Tablet
      • Energy Meter - 3 Phase
      • Energy Meter - 1 Phase
      • Fire TV Stick
      • Diagnostic Device
      • Energy Meter - EM210
      • Cellular Connectivity
    • API
      • Signals
    • Node Red
    • Data Export
      • MQTT
      • DB Sync
      • Station Time Windows
    • Onboarding
      • Welcome
      • Getting Started
      • Implementation
      • After the installation
      • For your IT Team
  • Use Busroot
    • Live Monitoring
      • Cockpit
      • Dashboards
    • Production
      • Production Monitoring
    • OEE
      • OEE Chart
      • PT vs NPT
      • Downtime Detection
      • Utilisation Monitoring
    • Admin
      • Plants
      • Stations
      • SKU Management
      • Shift Patterns
      • Notifications
    • Production Schedules
      • Schedule CSV Upload
    • Operator Tablet
      • Interruption Tool
    • Manage Your Stations
    • Alerts and Emails
  • Releases
  • CUSTOMER GUIDE TO BUSROOT
    • CUSTOMER GUIDE TO BUSROOT
      • Requirements before and during Installation
        • Pre-Installation requirements
          • Completing the Work order form
        • What hardware will you need and do we provide it?
        • Connectivity requirements to use Busroot
        • Installation
        • Self-Installation and configuration guide
      • A user guide to getting started with your account
        • Setting up your Plant
        • Login to your account
        • Station Setup
        • SKU Setup
        • Shift Patterns
        • Notifications
      • Glossary of Busroot Menu Features and how to use them
        • Menu - Overview
        • Menu - Live Monitoring
          • Production Progress
          • Cockpit
        • Menu - Production
        • Menu - Scheduling
          • Production Schedules
          • Schedule CSV Upload
        • Menu - OEE Analysis
          • PT vs NPT
          • OEE Chart
          • Utilisation Monitoring
          • Downtime Detection
        • Menu - Energy
      • How to troubleshoot common questions
      • Technical information
        • Device/DAU Management
        • Hardware
          • Arduino Opta
          • Tablet
          • Energy Meter - 3 Phase
          • Energy Meter - 1 Phase
          • Fire TV Stick
  • Workflows
    • Basic Utilisation Monitoring
    • Performance Monitoring
    • Production Progress Forecasting
    • Manual Production Progress Tracking
    • Understanding Downtime Trends
    • Understanding Production Trends
    • Daily Email Summaries
    • Adhoc Production Tracking
    • Short Interval Control
    • Wasted Energy
    • Understanding Energy Consumption Trends
    • Raw Data Access
    • Understanding OEE Trends
Powered by GitBook
On this page
  • Benefit
  • Setup
  • Daily Workflow
  1. Workflows

Basic Utilisation Monitoring

Using a simple threshold on station productivity to identify prolonged periods of stoppage, without the need to input production schedules.

Benefit

Identify and rectify unnecessary equipment stoppages.

Setup

For each station to be monitored, set a utilisation downtime threshold. This is the minimum number of minutes that should be considered as excessive downtime of the station.

If you do not intend on inputting production schedules, ensure the setting 'Assume All In Shift Time is Planned Production' is set to true.

Daily Workflow

  1. Ensure a Non Production Schedule is entered for any stations that aren't planned to run to prevent downtime being wrongly recorded.

  2. Busroot will automatically detect downtime based on the utilisation threshold settings.

  3. Production manager will receive a notification that the station is stopped.

  4. Operator or production manager will attribute a cause for the stoppage.

  5. During team meetings, the previous days downtime reasons are reviewed and discussed.

PreviousWorkflowsNextPerformance Monitoring

Last updated 3 months ago