Busroot Docs
  • Intro
    • Authentication
  • Integration
    • Device/DAU Management
    • Hardware
      • Arduino Opta
        • Configuration
      • Tablet
      • Energy Meter - 3 Phase
      • Energy Meter - 1 Phase
      • Fire TV Stick
      • Diagnostic Device
      • Energy Meter - EM210
      • Cellular Connectivity
    • API
      • Signals
    • Node Red
    • Data Export
      • MQTT
      • DB Sync
      • Station Time Windows
    • Onboarding
      • Welcome
      • Getting Started
      • Implementation
      • After the installation
      • For your IT Team
  • Use Busroot
    • Live Monitoring
      • Cockpit
      • Dashboards
    • Production
      • Production Monitoring
    • OEE
      • OEE Chart
      • PT vs NPT
      • Downtime Detection
      • Utilisation Monitoring
    • Admin
      • Plants
      • Stations
      • SKU Management
      • Shift Patterns
      • Notifications
    • Production Schedules
      • Schedule CSV Upload
    • Operator Tablet
      • Interruption Tool
    • Manage Your Stations
    • Alerts and Emails
  • Releases
  • CUSTOMER GUIDE TO BUSROOT
    • CUSTOMER GUIDE TO BUSROOT
      • Requirements before and during Installation
        • Pre-Installation requirements
          • Completing the Work order form
        • What hardware will you need and do we provide it?
        • Connectivity requirements to use Busroot
        • Installation
        • Self-Installation and configuration guide
      • A user guide to getting started with your account
        • Setting up your Plant
        • Login to your account
        • Station Setup
        • SKU Setup
        • Shift Patterns
        • Notifications
      • Glossary of Busroot Menu Features and how to use them
        • Menu - Overview
        • Menu - Live Monitoring
          • Production Progress
          • Cockpit
        • Menu - Production
        • Menu - Scheduling
          • Production Schedules
          • Schedule CSV Upload
        • Menu - OEE Analysis
          • PT vs NPT
          • OEE Chart
          • Utilisation Monitoring
          • Downtime Detection
        • Menu - Energy
      • How to troubleshoot common questions
      • Technical information
        • Device/DAU Management
        • Hardware
          • Arduino Opta
          • Tablet
          • Energy Meter - 3 Phase
          • Energy Meter - 1 Phase
          • Fire TV Stick
  • Workflows
    • Basic Utilisation Monitoring
    • Performance Monitoring
    • Production Progress Forecasting
    • Manual Production Progress Tracking
    • Understanding Downtime Trends
    • Understanding Production Trends
    • Daily Email Summaries
    • Adhoc Production Tracking
    • Short Interval Control
    • Wasted Energy
    • Understanding Energy Consumption Trends
    • Raw Data Access
    • Understanding OEE Trends
Powered by GitBook
On this page
  • Discovery
  • Identify the machines and processes to be monitored
  • Confirm available networking
  1. Integration

Onboarding

Discovery

Objectives of the discovery phase:

Identify the machines and processes to be monitored

  • Photograph the machine in location

  • Photograph controls including inside cabinets

    • Is there available space for a new device?

    • Is there a 24v DC supply available?

      • If not, what power options are available?

  • Find and photograph any available schematics

  • Identify signals, where possible, for:

    • Running indication

      • Andon Lights (Green)

      • Idle position light (negative indication)

    • Production Cycle Counts

      • Actuators or relays related to cycle

      • Optical sensors

    • Line Speed

      • Available via PLC as OPC-UA data.

      • Analogue Signal

        • e.g. 0-10v signal from motor inverter

    • Error indicators

      • Error lights

      • Andon Lights (red)

  • Document information regarding electrical supply

    • Number of phases

    • Power rating

    • Photograph relevant connection and supplier

  • Energy Monitoring

    • For each machine let us know how many phases the machine uses (single phase or 3 phase).

    • And what the maximum current draw is?

Confirm available networking

  • WiFi

    • Confirm which WiFi network is to be used.

    • Use mobile app to confirm networks signal strength at each machine

      • Window: Use WiFi connections manager.

  • Ethernet

    • Which machines is wired Ethernet available at. (Less important if WiFi is available)

PreviousStation Time WindowsNextWelcome

Last updated 10 months ago

Android:

https://play.google.com/store/apps/details?id=abdelrahman.wifianalyzerpro&hl=en&gl=US&pli=1